HOA Cut Down My Windmill — Then the Utility Company Asked Why the Pumps Stopped

HOA Cut Down My Windmill — Then the Utility Company Asked Why the Pumps Stopped

Chapter 3

Theme:
Font Size:
24px

The old one is enamel and rusted at the corners and says: "Private Utility Equipment. Authorized Access Only."

The new one, which I put up 9 years ago, says the same thing with the cooperative's contact number under it.

Caleb stopped talking. He looked at the door, then up the hill at the tower, then back at the door, and I watched him do the arithmetic. He asked if the mill was tied to the pump house. I said it was. He asked if the pump house was tied to anything else. I said it was tied to a transfer well and a booster station, and that both of those served things on his side of the fence.

He wrote that down. He asked me to write it down, too. So, I did on the back of one of his forms, and I signed it and dated it. And he said he would put it in his report.

He did put it in his report. I know he did because Vanessa quoted a different part of that same report back at me 11 days later, which means she had the document in front of her. What she quoted was Caleb's line about corrosion on the lower tower section, which is a normal note about a galvanized structure that has been outdoors since Truman was president. What she skipped was the paragraph about active utility equipment on the parcel.

The ultimatum came certified on a Monday. 72 hours to disable and remove the wheel assembly, or the association would "take whatever action it deemed necessary to protect community safety and property values." I read it standing at my mailbox in the rain. I wrote back one word on association letterhead they had enclosed for my response, because I thought that was funny, and the word was "No." I mailed it certified, too. Paper is patient.

She came out on the second day. She parked in my driveway this time, right behind my truck, and she came up the porch steps without being asked. She looked at the truck and at my boots by the door with three weeks of pasture on them, and she smiled the way she did at the fence in April.

She asked if I really wanted to pick a fight with an entire homeowners association over a pile of scrap metal.

I told her no, I did not want to fight at all. I told her I just did not want her people touching my property. I told her one more time plainly, standing on my own porch, that the equipment on that hill was live and that if anybody interfered with it, the consequences would not land on me.

She listened to about half of that. I could see her waiting for me to finish so she could say the thing she had driven over to say. She went down the steps and turned around at the bottom and she said, "Well, then do not blame me when the board handles it itself."

Then she got in her car and backed down my driveway too fast. And a piece of my gravel went into the ditch, and I stood on the porch and watched her taillights and knew the way you know weather is coming that she was going to do it.

I left the house at 5:40 on Thursday morning to drive to a supply yard two counties over for a replacement seal and a length of shafting I had been waiting on for a month. It was a 4-hour round trip with the pickup, longer with the stop. And I remember thinking on the way out that the wind was good and the mill was turning nice and steady in the dark. I fed the dog, checked the gauge through the pump house window with a flashlight, and locked the gate behind me the way I always do. The gate has a chain and a padlock and a sign on it. And every single one of those three things was ignored before noon.

I got back a little after 11:00. I saw the trucks before I saw the hill. There was a flatbed parked in my pasture with the ruts to prove how it got there, a small crane with its outriggers down in my grass, a cutting rig, and five men in high visibility vests, standing around drinking coffee like it was any other job site. The gate chain was on the ground with a fresh, bright cut through one link. My dog was shut in the barn, which somebody had at least been decent enough to do.

The windmill was down.

That is a sentence I have said out loud maybe six times, and it still does not sound like a thing that happened. The tower had been cut through at the second brace and folded over, and the wheel was lying in the pasture on its side, with the sails bent under their own weight, and the tail vane my grandfather painted was snapped off and sitting in the mud. The gear head had been cut free. The drive shaft that carried motion down the hill into the pump house had been severed in two places, and the coupling was in a bucket with a bunch of other pieces somebody had decided were scrap.

News in the same category

HOA Cut Down My Windmill — Then the Utility Company Asked Why the Pumps Stopped

8 Part