I Inherited A 1,700-Acre Ranch With The HOA's Power Lines Crossing It — So I Shut Their Grid Down

I Inherited A 1,700-Acre Ranch With The HOA's Power Lines Crossing It — So I Shut Their Grid Down

Chapter 4

Theme:
Font Size:
24px

He underlined. He wrote in long Wyoming longhand. Termination clause and unauthorized scope expansion across separate sheets of yellow legal pad. Finally, he leaned back, folded his hands across his stomach, and looked at me over his reading glasses.

"Quinn," he said, "this case is junk. Their declaratory judgment is fiction. Their interpretation theory has no precedent in Wyoming utility law. The court ought to throw it out at first appearance. But Judge Castille is presiding, and Judge Castille, while not in any way corrupt, is a procedural conservative who will not move quickly on a complex easement matter.

She'll grant the temporary injunction, freeze everything, and set a 6-month schedule. That's exactly what Della Vosberg wants. She wants delay. She wants time to establish more facts on the ground. She wants you to settle out of exhaustion. How do we not let that happen?"

He smiled slowly, the way a country lawyer smiles when he's already thought past the obvious move. "Quinn," he said, "the district court is the wrong forum. You are not going to win in district court. You're going to file a parallel complaint with the Wyoming Public Service Commission tomorrow morning.

The PSC has primary regulatory jurisdiction over private utility easements with public service connections. They will move faster than any court. They will subpoena the cooperative's records. They will compel disclosure of the 2010 upgrade documentation. And while the district court is grinding through its preliminary motion schedule, the PSC is going to find that the line has been operating outside its lawful scope for 15 years."

I asked him about the easement termination clause. He smiled wider. "You are going to file your termination notice with the HOA, certified mail, by close of business today. The 180-day clock starts now.

By the time the district court gets to its first substantive hearing, your clock will be at day 90. By the time the PSC issues its preliminary findings, your clock will be at day 120. And by the time anyone in Cloud Peak Estates figures out what is happening, the clock will be at day 175. And you will be 7 days from contractually de-energizing the line on your own property."

I sat in his office for a long minute and let that timeline settle. Then I asked him what we should do in the meantime. He said, "We tell nobody. We let the HOA fight the district court case while we win the regulatory war underneath them. And on day 180, if Della Vosberg has not negotiated, you walk to the disconnect at the southern fence line and you flip the switch."

I drove home that afternoon with a notarized termination notice in a manila folder on my passenger seat and a parallel PSC complaint ready to file in the morning. I took the long way home through Story because I wanted to think. The next morning, I drove down to Cheyenne.

The Wyoming Public Service Commission's offices are on the third floor of a 1968 limestone state building in the capital with one elevator that smells like dust and one window in the conference room that looks out at the rotunda. Annette Pillsbury met me at the front desk. She was 48, sharp, and had spent 22 years investigating private utility easement disputes across the state. She read my complaint at her desk for 40 minutes without speaking. When she looked up, her expression was the expression of an engineer who had just been handed a problem she has been waiting 15 years to find.

"Mr. Ardmore," she said, "I need you to leave this file with me. I need you to come back in 2 weeks, and I need you to brace yourself because the cooperative is about to be on the receiving end of a regulatory inquiry that will land in the Cheyenne newspapers within 30 days."

I left the file. I drove home in the slow Wyoming afternoon light. That same week, I called my old WAPA colleague, Dr. Alaric Fenton, who had retired from the agency in 2019 and now consulted on transmission infrastructure cases out of Fort Collins. Alaric drove up the next Tuesday with two binders and a coffee thermos.

He spent 4 days walking the easement corridor with me, taking voltage readings, photographing transformers, examining the conductor specifications, and pulling the developer's 2010 engineering filings from the Wyoming State Archives. His report, when it landed on my kitchen table at the end of the week, ran to 211 pages. The summary, in the first paragraph, contained one sentence I will not forget. "The line through Mr. Ardmore's property, as currently operated, is in violation of the original easement scope, the Wyoming Public Service Commission permitting requirements, Federal Rural Utilities Service Safety Standards, and Cloud Peak Estates' own developer commitments to its 2010 county zoning approval." That sentence, by itself, was enough to dissolve an HOA.

Wren came down from Bozeman the second weekend of April. She walked the easement corridor with me at dusk. She listened to me explain the voltage upgrade, the termination clause, the 80 ft clearing, the unauthorized 2010 work. When I finished, she stood at the edge of the cottonwood line and looked at the ruined trees for a long minute.

"Dad," she said, "Mom always said you'd never lose a fight you took notes on." I told her I had already started taking notes. She smiled. She put her arm through mine. "Take more."

We walked back to the farmhouse the long way, through the upper bench, past the small headstone my uncle had set in 2019 for his old border collie. The wind was picking up off the foothills the way it does in early spring. Wren told me, somewhere along the trail, that her mother had once said the Ardmore men were slow to anger, slower to forgive, and absolutely impossible to outwait. She told me that line had stayed with her through dental school. She told me she was glad she could finally see it from the inside.

Over the next four weeks, Vernon Crowell, Annette Pillsbury, Kit Bensenhurst, Alaric Fenton, and I built the regulatory case the way you build a transmission tower, foundation first, steel up, one bolt at a time. We filed the parallel PSC complaint. We attached Alaric's engineering report. We attached the 1958 easement deed.

We attached photographs of the cleared right-of-way. We attached the cooperative's voltage findings. We attached my uncle's 1981 to 2009 correspondence with the cooperative, which contained no record of any voltage upgrade authorization. We attached the developer's 2010 county zoning application, which described the line as existing infrastructure without disclosing the upgrade.

Within 72 hours, the PSC issued a formal preliminary inquiry. Within 10 days, they They subpoenaed the cooperative's records, the developer's records, and the HOA's correspondence files. Meanwhile, I drafted with Vernon a public information letter to every resident of Cloud Peak Estates. The letter explained in plain English the 1958 easement, the 2010 upgrade, the termination clock, the alternate routing options that existed. A re-route around the eastern boundary of my property would cost approximately $3.4 million and take 90 days to construct. It also included an open invitation to a community information session at the Sheridan County Extension Office on the first Tuesday in May.

News in the same category

I Inherited A 1,700-Acre Ranch With The HOA's Power Lines Crossing It — So I Shut Their Grid Down

7 Part